Selection of Procurement Strategy
Selection of Procurement Strategy 1.0 INTRODUCTION A major determinant of project success is the selection of the most appropriate procurement strategy which will be used as a frame work to acquire the services of professionals in the industry (Morledge at al, 2006). This report presents the stages that have to be gone through in other to select the best procurement strategy for Janus Leisure plc. Before a suitable project strategy can be selected, there are many variables that need to be considered. However, Masterman (2002) explains that with regards to procurement, only those sub strategies which will have an impact on the ultimate procurement strategy should be considered. He therefore describes the process as consisting of: understanding the client, assessing client objectives, identifying the project constraints including risks and the method of organising the design and construction. These points will therefore form the framework of this report. 1.1 CLIENT Clients in the construction industry are becoming complex in their requirements which has subsequently led to increased client dissatisfaction levels (Latham, 1994). It is therefore essential to identify the type of clients being dealt with as this will have an influence in the choice of procurement method. Based on the categorization of clients by Masterman (2002), Janus leisure plc can be described as a private organisation who generates its funds from its internally business activities and therefore are concerned with profit maximisation wherever possible. Furthermore, we can also say that, the client is an inexperienced client in terms of construction as their main business focus is horse racing. It does not involve in construction activities often and only owns 6 racecourses. However, it is assumed that, the client is very aware of what infrastructure of its business should look like. Finally, we can also say that Janus leisure is a secondary client who requires the building to enable it them house their business activities. This therefore means that construction represents only a small percentage of their annual turn over. 1.2 PROJECT SCOPE The company intends to improve its flagship racecourse at Melchester which hosts the 5000 guineas stakes every year. The proposals are to be undertaken in two phases: Phase I demolition of the existing grandstand the construction of a new 5-storey grandstand to include an extensive conference and exhibition centre (10,000m2 total) and associated external works (budget à £25M) refurbishment of two existing stands circa 100 years old (budget à £5M) Phase II construction of a new 120-bed hotel facility and casino (budget à £12M) to be operational for the 2013 5000 Guineas Stakes meeting in mid-September 1.3 CLIENT OBJECTIVES Janus leisure plc has to consider a number of factors in other to choose the best procurement strategy for the project. To provide guidance for client on their decision of the most appropriate procurement strategy to adopt, Turner (1997) proposed a list of seven factors to consider. Completion time variation complexity quality price certainty price competition management and accountability These will be discussed in detail in the next sub section. Client requirements The objectives and requirements of the client in this report have been categorised under cost, quality and time expectations of the client. They also represent the criteria used by the client in the assessment of the procurement strategies. The following criteria as adopted from Turner (1997) has been established and discussed. Cost Relevance of cost certainty Janus leisure plc is a company which aims at maximising profit wherever possible. It will therefore not intend to spend more than it has budgeted for each section of the development. This implies that, high on the priority of the client is to have a fair idea of how much the project will cost prior to the start of the actual construction. Since the company desires to constantly invest in all of its venues over the coming years. It will therefore be preferable that any strategy chosen should be able to give an idea of the total commitment to be expected, since the project is phased, it means that, this will be a tougher consideration for the first phase but will be achieved to higher degree of accuracy I the second phase Relevance of price competition Janus leisure has a total budget of à £42M for the entire project. With this commitment in mind and a fair certainty of the cost, the client does not really place so much focus on the competition for phase 1. Though Turner (1997) explains that best market price can only be obtained through competition, the client is of the view that factors such as time requirement are of more concern to him and any bid which was around his budget was alright for the first phase. With regard to the second phase, since there will be more time., it is the intention of the client to use competition in other to attain the best price as such therefore any opportunities for price competition will be preferred more. Organisation and accountability It is assumed that the client is fully aware of the fact that, risks go with premiums. However, Janus leisure plc prefers a single point responsibility for the construction of the hotel and will be prepared to pay a premium for that. Clamp et al (2007) argues that leaving both design and construction within one entity could have compromising effects on the quality; however, Janus leisure will prefer to have to deal with just one company in other to eliminate the hassle of lengthy negotiations with many professionals. The client requires that it retains the control for the management of the first phase because it is of more importance to him as he needs it to be ready by 2012. Time Early completion This is a very high priority for the client because they intend to return the 2012 5000 guineas stakes to Melchester. This clearly states that phase 1 should be competed and ready for commissioning before that time. It is known that the duration of the fist phase is short as such early start in needs to ensure early completion. Similarly, with the second phase, it must be completed be 2013. Though this seem to be a longer, advantage should be taken to obtain more competitive while maintaining acceptable standards of quality. Therefore, time is of a higher priority in phase 1 than in phase two Phased requirements The proposed developments are in two phases and should be carried out as such, the duration of the first phase is 2 years which should be ready by mid-September 2012 while that of the second phase is three years and should be completed and ready to use by mid September 2013. As a private client, completion time is of a high priority. Quality Variations Janus leisure plc has been describes as an in experienced client, as such there is the possibility for the client to want to change his mind as the project progresses. Furthermore, the extent of the refurbishment in the first phase cannot be fully envisaged. This implies that, there is an increased possibility of significant variations. However, variations will be minimal in the second phase because, Janus has built some hotels in the past and therefore know what exactly they will want to have in this hotel. It is important to consider variations because they entail high costs and have effects on the construction period and also each procurement method deals differently with variations. Level of prestige Horse racing is a sport that is patronised by a large cross-section of the public as well as wealthy and rich; however, the proposals by Janus leisure does not call for a prestigious design though the requirements of the conferencing, banqueting as well as the hotel should be good and incorporate state-of-the-art technology. Project complexity In terms of complexity during procurement, functionality of the project is not an essential requirement however; complexity of the construction itself and the environmental services is usually very significant (Turner, 1997). The requirements of the project are fairly straightforward as the major requirements were air conditioning and public address systems therefore; complexity is not a great problem in the first phase. With the second phase, more facilities like escalators, lifts and air conditioning facilities will be provided but that notwithstanding, we can say that both faces require a good quality. Risk It is important that any risks to the project are to be effectively managed by the party that is best able to handle them. And every procurement system distributes the risks between the client and contractor (Masterman 2002). Some procurement methods allocate more of the risks to the client and others more to the contractor. Since the client want to control of the first phase, they accept to have the risk even though they will prefer to share them wherever possible. Because the client is quite inexperienced in construction, will prefer to leave to as much of the speculative risk as possible with a single contracting entity though they are aware this might mean payment of premiums for the second phase because it will need time to organize its business activities. 2.0 PROCUREMENT SYSTEMS With respect to the client requirement, four procurement methods have been selected to be appraised because of the peculiar characteristics they have which may be of interest and suitability to the project. They are Traditional method Design and build Management contracting Construction management 2.1 TRADITIONAL METHOD This method is referred to by some authors and researchers as the separated system and it is the oldest form of procurement (Masterman, 2002). It is characterised by the separation between the design and the construction phases and therefore offers multiple points of responsibility (Oyegoke et al ,2009). The client first appoints consultants who will be responsible for the design, cost control and contract administration. Once the design in complete, the client and his team invites tenders from suitable contractors and eventually appoints one of them who will be responsible for carrying out the works. There is therefore direct contractual relationship between the client and the consultants and also between the client and the contractor. The contractor is responsible for all the workmanship and materials including work by sub-contractors and suppliers (Clamp et al, 2007). In some cases, the client could novate subcontractors or suppliers with whom the main contractor will have legal c ontracts. The figure below shows the contractual relations of this system. Fig 1: Contractual relationship; The Traditional Procurement Method (Morledge et al 2006) Use of Traditional method of procurement According to Murdoch and Hughes (2008), following the criteria developed by the Joint Contracts Tribunal (JCT 1988), the following are a proposed a list of instances which traditional method is most suitable. The employer has caused the design to be prepared and for the purposes of the building contract takes responsibility for it. The employers designer is sufficiently experienced to co-ordinate and lead the design team and to manage the interface between design and production. The design is substantially complete when the contractor is selected. An independent quantity surveyor will be used to plan and control the financial aspects of the project The contractor is selected on the basis of the contractors estimate and carries the risk that the estimate may be wrong. The employer reserves the right to select sub-contractors for certain parts of the work. ââ¬ËPrime cost sums including employer-selected sub-contracts, do not form the major proportion of the contract sum. The employers agents feel that it is important to use an acceptable negotiated form to ensure a fair and familiar distribution of risk. The employer makes no explicit choice and the advisors do not raise the issue. Suitability With regard to the requirement of the client, the traditional method will be very suitable with regard to price certainty which is high on the priority of the client for the first phase. This is because designs will be completely finished and bills of quantities produced which will be priced by tendering contractors. As such, Janus will know its financial commitment to a high degree of accuracy before the start of the project. However, the problem will be whether there is enough time for full designs to be produced followed by tendering before actual construction starts. This is a concern because completion time is equally of high priority to the client and so the traditional method might not be so suitable in that regard. The traditional methods is also one of the best ways to secure best market price as there is competition between tendering firms, however, since competition is not high on the priority of Janus leisure plc for the fist phase, the second phase will take advantage of that. Since variation is to be expected in the project during the first phase, the traditional method will allow, Janus leisure, a flexibility of mind until when the tender documents are prepared for bidding. After this, changes in specification might be very costly and time wasting. It will be suitable for the second phase as well because variation is expected to be even lower. Janus leisure will not be favoured in terms of his accountability requirements for the second phase because Oyegoke et al (2009) explains that this system introduces multiple points of responsibility. 2.2 DESIGN AND BUILD This system is characterised by the integration of the design and construction phases. Masterman (2002) explains that, the commonly used integrated system is the design and build method however there are other variants such as novated design and build, develop and construct, package deal and turn key projects. Within this report, only the design and build variant is considered. The approach leaves full responsibility of the design and construction with a single organisation: the contractor. Rashid et al (2006) explains that, the selection of the most suitable contractor is based on the brief and the specification given by the client at the time of bidding. In effect, the contractor has the total responsibility for all the works, co-ordination and integration of the whole process as well as appointment of any consultants, specialists or subcontractors (Murdoch and Hughes, 2008). Figure 2.2 shows the contractual relation with this system. Fig 2 Contractual relationship: The Design and Build system (Morledge et al 2006) Use of the design and build method According to Murdoch and Hughes (2008), there are some characteristics of a project which determine whether the design and build method will be suitable for a particular project, theses are listed below: The clients familiarity with construction(experience) The relative importance of client priorities (time, cost, function, quality, value for money etc.) The technical complexity of the project The need to make variations to requirements as work proceeds The patterns of responsibility and communication The need for an early start on site. Suitability With regard to the requirements of Janus leisure plc, this method will be suitable in regard to project completion time because of the integration of the construction and design phases will make the project faster, furthermore, since there is a lump sum fixed price for the bespoke design and construction (Masterman, 2002) the client will equally have high degree of price certainty prior to the start of the project. This method will be suitable because for the client in the second phase in terms of his risk allocation requirement as most to the risk will tend to be with the contractor however, it may not be suitable for the first because the client wants to retain more control. Also, design and build will be suitable for the client because the client will only have one contractual relation with the contractor which will march his responsibility criteria. However many researchers including Masterman (2002) and Turner (1997) have argued that since both design and construction are left w ith the contracting firm, there could be possible compromises in the quality expectation in terms of both design and more importantly workmanship and materials, I will also argue that since the client will give a comprehensive brief with little variation for the second phase, this should not be a big problem. It is again worthy to note that the system will not particularly be suited to the variation requirement of Janus leisure plc for the first phase. The criteria established the possibilities of variations as the project progresses, especially in the first phase but the design and build system freezes excessive variation at an early stage when the contract is signed and any changes after that will tend to cost the client lots of money and time. Fortunately, Janus is already aware of this. Again, leaving both the design and construction on the contractor means leaving more risks with him and this will involve payment of premiums as such. 2.3 MANAGEMENT CONTRACTING This is a method of procurement in which the management contractor is paid a fee by the client to manage the whole building process and therefore has direct contractual relations with all the works contractors (Morledge at al, 2006). The management contractor advices on the buildability of the designs as well as value management during the design. The construction works are let out in packages therefore there is early start with this method. The management contractor does not take part in the actual construction but provide preliminaries for the project. The figure below shows the contractual relation with the management contracting form of procurement. Fig 3.Contractual relationship: Management contracting (Morledge et al 2006) Use of Management contracting Murdoch and Hughes propose a list developed by the Joint Contract Tribunal (JCT, 1987a) which indicates suitable circumstances in which to use Management contracting. The list is as follows: The employer wishes the design to be carried out by an independent architect and design team There is a need for early completion The project is fairly large The project requirements are complex The project entails, or might entail, changing the employers requirements during the building period The employer requiring early completion wants the maximum possible competition in respect of the price for the building works. Suitability This system of procurement is desirable in respect of the client priorities of completion time because of the overlap between design and construction, furthermore, as the work will be let out in packages, competition, though not of a high priority to the client, can be used to attain best price. Under this procurement method, the client will also be able to have a fair certainty of the price before the start of the project. The system will also be suitable in terms of the variation requirements of the client for the first phase because the full design is co-ordinated and developed by the client and his team, as such there is much room for flexibility until that package has been let out on contract. With this procurement system, much of the speculative risk is with the client while works contractors take just a little (Clamp et al, 2007) as such this will be acceptable for the first phase but not quite meet the expectation of Janus leisure for the second phase as they prefer to leave much of the speculative risks with the contracting firm. 2.4 CONSTRUCTION MANAGEMENT With this procurement system, the client appoints the construction manager on the basis of a fee to manage, prepare and co-ordinate the design and construction as well as advising the design team on the buildability of the design (Morledge et al, 2006) as such the client does not allocate risk and responsibility to a single firm because the works are subsequently let out to packages contractors who are in direct contractual relation with the client. The contractual relation with this procurement type is shown below. Fig 4 Contractual relationship: Construction management (Morledge et al 2006) Use of Construction management According to Murdoch and Hughes (2000) Construction management is suitable when the characteristics of the project fulfils in part or whole of the following: The employer is familiar with construction, and knows some or all of the professional team. The risks associated with the project are dominated by timeliness and cost (e.g. the employer may be a private sector employer requiring a commercial building). The project is technologically complex involving diverse technologies and sub-systems. The employer wants to make minor variations to requirements, as the project proceeds. There is scope for separating responsibility for design from responsibility for management of the project. The employer requires an early start on site. The price needs to be competitive, but ââ¬Ëvalue for money is more important than simply securing the least possible cost. Suitability This procurement method similar characteristics with the management contract variant, however, there are some differences. The completion time requirements, variation requirement and quality requirements is the same as in the management contracting. However, this system leaves virtually on all the risk on the contractor: a trait which will not suit the requirement of Janus leisure plc. Furthermore, the is no certainty of price as the system works with target sum but advantage can be taken of price competition as the packages are let out to package contractors. Another point worthy on mentioning is that, this method will not particularly suit the responsibility requirement of Janus leisure, who prefer to have to deal with just one contractor. 2.5 RISK SHARING This determines the apportionment of the risks that occur to the party that is able to handle it more adequately than the other. Some procurement methods allocate more of the risks to the client and others more to the contractor, Janus leisure plc is willing to accept some of the risk provided they will be able to foresee it before it occurs for the first phase but will prefer to leave much risk on the contracting firm fro the second phase. The different procurement methods have limits to which the client can tranfer risk. A speculative risk chart according to the different procurement methods can be seen below table 1 : Speculative risk (Clamp et al., 2007) 3.0 SELECTION PROCESS The aim of the selection process is to accurately identify the best procurement route which meets and satisfies the client requirements best (Masterman, 2002). The tables below shows the results of the assessment criteria for the two phases of the project Table 2 priority checklist for phase 1 Table 3priority checklist for phase 2 3.2 PROCUREMENT SYSTEMS FOR PHASE 1 Based on the rating on table 2 and the clients success criteria, the management contracting procurement system has been recommended to be used in the execution of phase 1 Reasons for recommendation It has been established already that time is crucial to the first phase of the developments, as such, this procurement system is suitable because it allows construction to start early once a work section has been completely designed, for example, immediately the foundation are fully designed, the client and his team can give that part out on contract as the designed is continued. The client still retains full control of responsibility of the design as the construction goes on, so since Janus indicates the possibility of variations this will be very much accommodated while the management contractor contributes to the buildability of the designs. The client and his team will also have the chance to select materials and techniques in other to achieve the standard it requires which still reduces maintenance costs. 3.3 PROCUREMENT SYSTEMS FOR PHASE 2 Based on the critical analysis of the critical factors of success for the project as well as the adoption of the table 3 above, the competitive design and build system of procurement has been chosen for the construction of phase 2. Reasons for recommendation The client rates time as important as such, since the contractor is in charge of both the design and construction, there will be an early start of the project on site which will guarantee completion to schedule. However, since the responsibility of the design will be that of the contractor, the client will have to provide a good brief to the contractor in other to eliminate any confusion. This will be required to a great extent so that variations will be reduced to the barest minimum. The design and build procurement method is also best for the phase because the entire of design and construction has been shifted to the client and this suit Janus as a client thought the implication is the likelihood for an increased cost. The client is satisfied with this option because he will have enough time for his own business activities Also, since Janus does not require direct professional accountability for the design and consultants for the second phase, this system proves to be very suitable because the design and build system leaves the entire accountability between the contractor and his team and Janus only has a single contract with the main contractor Janus requires a high degree of price certainty before the start of the construction and the design and build system offers this. Moreover since the requirements indicated that the project is not so complex in terms of technical advancement, the system will be adequate and certain to deliver a product of good quality and workmanship. Finally, the adoption of the competitive variant of the design and build procurement system will give the client and his team the chance to select the best bid from the contractors as a result of the tenders that will be submitted based on the client brief. 3.3 ORGANIZATIONS TO BE COMMISSIONED The consultants to be commissioned for the first phase are as follows: Management Contractor: Engaged very early in the project to provide expert knowledge to other consultants on the constructability of the designs. Architect: Prepares all the necessary architectural designs in accordance with the clients brief and with the management contractor Quantity Surveyor: Carry out feasibility studies, prepare cost estimates and cost plans in conjunction with the designs. Also carry out interim valuations for payment to works contractors, in conjunction with the management contractor. Engineers: Prepare the structural, mechanical and electrical engineering drawings to be priced by the quantity surveyor and form part of the contract documents for executing the works. For the second phase, the client needs to contract a design and build contractor who will be in charge of both design and construction of the facility 4.0 CONCLUSION The proposals by Janus leisure plc have been thoroughly examined and discussed, going through the range of procurement methods and applying the table by CRT, it has been recommended that for a successful execution of the clients developmental proposals, management contracting should be adopted for the first phase while design and build is adopted for the construction of the hotel in the second phase. However, it must be stated that, the success of the project does not only depend on the procurement method used but also on the efficiency of the consultants and the contractors used. Therefore the client should be methodical in the approach for selecting the professionals for the execution of the work.
Friday, January 17, 2020
Effects of Public Policies and Government Entities on Social Class Essay
As discussed earlier, there can be many aspects that may affect social classes and these changes and differences can be seen almost everywhere. In this society, starting from schools, workplaces, clothes, music and even the lives in which people live in are all affected in one way or the other by social class. When it comes to a school, teachers may favor students coming from higher classes, and consider them as more intelligent and smarter than the others But this is not absolutely true, since there is simply no evidence that children of lower classes have lower levels of intelligence. Having said this, it is quite obvious when it comes to answering the question of who has the most power in the Country, it would be those who have money. Public Policies and the governmental rules and regulations are enforced within a country in order to minimize threats and inequalities and maintain and equal, prosperous and rightful nation. Governments and public policies are not supposed to be bias and it is definitely not enforced in order to support the rich and suppress the poor. Plus all these rules and regulations are considered to be common to all people living in the country and not just to a certain segment of it. But in the current context, this is rarely the case. Even the government is buried under the soil of power, money and greed, forgetting about all the norms and values of creating equalization among the society. The Sri Lankan Government, for example differentiates its ways of treating and benefitting people according to their social classes and mostly with regard to power and money. Here, the higher your social class is, the higher privilege you will receive, and those with high power will have more benefits and consolation when it comes to establishing public policies. True, there are more than enough criminal laws, and various other rules established in the society, but none of these may seem the least bit important to those who are within the high power hierarchy. All the lower class people, the poor, and oppressed will be the only ones who are punished, and to whom against the government may take high legal action. It brings great curiosity to me, when thinking about, how long the government and politician will be able to fool the power people of the country into thinking that law is the same for everyone! For example, if you take into consideration the Sri Lankan court system, we can see thousands of people flocking in courts, just to get to their hearing. Poor eople, with very minor faults and accused faults are kept in prison for ages, since they are unable to pay a little of their debt money to the courts and those from richer and classier families, are taken in to custody, questioned and then simply let off, no matter how big their crime is. This is one of the main reasons as to why, there are so many strikes and industrial unrest occurring in the country when poorer people try to take things to their own hands when justice is to laid upon them by law. The effects of social classes on the 2012 US election lies unknown to me, since I do not have enough information and facts in order to elaborate my point. Therefore, let me bring forth a situation where the issue of social classes affected the elections in Sri Lanka. For a person in the higher classes, it is not of much importance on who wins the election. No matter who wins and comes to power, they know that, similarly they will also have enough power in order to get what they need and survive in the society, arm to arm with the politicians. Although the citizens are entitled to free speech and right to vote, always the one with greater power and a certain level of cunningness will always get the poor peoples votes, win and then gradually wash their hands over the people who brought the win to them. It is a well known fact that most of the cabinet holders are of the upper class. And the oppositions, who are known to be the party that benefits the common people in the country, are also packed with upper class people, who do not even have the necessary educational qualifications in order to get there. The people of lower classes will always want a government that provides them with enough benefits and appreciation for the work they do. They would also dream of and era, where the poor and the rich would be treated the same and they wouldnââ¬â¢t have to be oppressed and ignored and given priority when it comes to getting their work done at a government institute. If the poor have to stay in long queues for hours, then the law should be that, no matter how big you are, they should also follow the same procedure. Yes, I do agree with the authors opinion,, since the author has clearly illustrated through figure 7, that poverty is unequally distributed according to race and that statics show how, mostly colored people are considered to be the poor and families with women heads are considered to be poorer than those lead by men. It is certain that the inequality among the class groups will further strengthen if necccassary precautions and actions are not taken by the authorities that are responsible.
Thursday, January 9, 2020
Post Traumatic Stress Disorder ( Ptsd ) - 2503 Words
Introduction Since September 1, 2001, America has been involved in warfare in the Middle East with over 2.2 million men and women serving in combat zones experiencing more tours, higher levels of perceived risk and more cultural integration within ranks than ever seen in history (Crocker, Powell-Cope, Brown Besterman-Dahan, 2014). According to Clark-Hitt, Smith and Broderick (2012) 14% of returning veterans are diagnosed with Post Traumatic Stress Disorder (PTSD) which they define as ââ¬Å"an anxiety disorder that may occur following exposure to a terrifying event or ordeal in which grave physical harm occurred or was threatenedâ⬠. In a military setting these events could consist of an environment of repeated bombing or threat of death, watching a comrade die, killing another human-being, even witnessing immoral violence on a daily basis. According to work done by Polusny et al. (2008) exposure to traumatic events can be a contributor to the perception of a lesser health st atus, an increase in physical health illness and increasing health care utilization and cost. Polusny et al. (2008) focused their research on the relationship between natural disaster trauma and physical health with a finding that natural disasters that produce PTSD symptom clusters do effect an individualââ¬â¢s physical health as well as the health care of the effected community for some time after said disaster. This paper however focuses on PTSD as it pertains to physical symptoms of American soldiersShow MoreRelatedPost Traumatic Stress Disorder ( Ptsd )990 Words à |à 4 PagesPost-Traumatic Stress Disorder Post-traumatic stress disorder is a common anxiety disorder characterized by chronic physical arousal, recurrent unwanted thoughts and images of the traumatic event, and avoidance of things that can call the traumatic event into mind (Schacter, Gilbert, Wegner, Nock, 2014). About 7 percent of Americans suffer from PTSD. Family members of victims can also develop PTSD and it can occur in people of any age. The diagnosis for PTSD requires one or more symptoms to beRead MorePost Traumatic Stress Disorder ( Ptsd )1471 Words à |à 6 PagesRunning head: POST-TRAUMATIC STRESS DISORDER 1 Post-Traumatic Stress Disorder Studentââ¬â¢s Name Course Title School Name April 12, 2017 Post-Traumatic Stress Disorder Post-traumatic stress disorder is a mental disorder that many people are facing every day, and it appears to become more prevalent. This disorder is mainly caused by going through or experiencing a traumatic event, and its risk of may be increased by issuesRead MorePost Traumatic Stress Disorder ( Ptsd ) Essay1401 Words à |à 6 PagesAccording to the Mayo-Clinic Post Traumatic Stress Disorder, commonly known as PTSD is defined as ââ¬Å"Post-traumatic stress disorder (PTSD) is a mental health condition that s triggered by a terrifying event ââ¬â either experiencing it or witnessing it. Symptoms may include flashbacks, nightmares and severe anxiety, as well as uncontrollable thoughts about the eventâ⬠(Mayo Clinic Staff, 2014). Post Traumatic Stress disorder can prevent one from living a normal, healthy life. In 2014, Chris Kyle playedRead MorePost Traumatic Stress Disorder ( Ptsd )1198 Words à |à 5 Pages Post-traumatic stress disorder(PTSD) is a mental illness that is triggered by witnessing or experiencing a traumatic event. ââ¬Å"PTSD was first brought to public attention in relation to war veterans, but it can result from a variety of traumatic incidents, such as mugging, rape, torture, being kidnapped or held captive, child abuse, car accidents, train wrecks, plane crashes, bombings, or natural disasters such as floods or earthquakes(NIMH,2015).â⬠PTSD is recognized as a psychobiological mentalRead MorePost Traumatic Stress Disorder ( Ptsd )1423 Words à |à 6 Pages Mental diseases and disorders have been around since humans have been inhabiting earth. The field of science tasked with diagnosing and treating these disorders is something that is always evolving. One of the most prevalent disorders in our society but has only recently been acknowledged is Post Traumatic Stress Disorder (PTSD). Proper and professional diagnosis and definitions of PTSD was first introduced by the American Psychiatric Association(APA) in the third edition of the Diagnostic andRead MorePost Traumatic Stress Disorder ( Ptsd ) Essay1162 Words à |à 5 PagesSocial Identity, Groups, and PTSD In 1980, Post Traumatic Stress Disorder (PTSD,) was officially categorized as a mental disorder even though after three decades it is still seen as controversial. The controversy is mainly founded around the relationship between post-traumatic stress (PTS) and politics. The author believes that a group level analysis will assist in understanding the contradictory positions in the debate of whether or not PTSD is a true disorder. The literature regarding this topicRead MorePost Traumatic Stress Disorder ( Ptsd ) Essay1550 Words à |à 7 PagesPost Traumatic Stress Disorder ââ¬Å"PTSD is a disorder that develops in certain people who have experienced a shocking, traumatic, or dangerous eventâ⬠(National Institute of Mental Health). Post Traumatic Stress Disorder (PTSD) has always existed, PTSD was once considered a psychological condition of combat veterans who were ââ¬Å"shockedâ⬠by and unable to face their experiences on the battlefield. Much of the general public and many mental health professionals doubted whether PTSD was a true disorder (NIMH)Read MorePost Traumatic Stress Disorder ( Ptsd )944 Words à |à 4 Pageswith Post-traumatic stress disorder (PTSD Stats). Post-Traumatic Stress Disorder is a mental disorder common found in veterans who came back from war. We can express our appreciation to our veterans by creating more support programs, help them go back to what they enjoy the most, and let them know we view them as a human not a disgrace. According to the National Care of PTSD, a government created program, published an article and provides the basic definition and common symptoms of PTSD. Post-traumaticRead MorePost Traumatic Stress Disorder ( Ptsd )1780 Words à |à 8 Pagesmental illnesses. One such illness is post-traumatic stress disorder (PTSD). Post-traumatic stress disorder is a mental illness that affects a personââ¬â¢s sympathetic nervous system response. A more common name for this response is the fight or flight response. In a person not affected by post-traumatic stress disorder this response activates only in times of great stress or life threatening situations. ââ¬Å"If the fight or flight is successful, the traumatic stress will usually be released or dissipatedRead MorePost Traumatic Stress Disorder ( Ptsd )1444 Words à |à 6 PagesYim ââ¬â Human Stress 2 December 2014 PTSD in War Veterans Post Traumatic Stress Disorder (PTSD) is a condition that is fairly common with individuals that have experienced trauma, especially war veterans. One in five war veterans that have done service in the Iraq or Afghanistan war are diagnosed with PTSD. My group decided to focus on PTSD in war veterans because it is still a controversial part of stressful circumstances that needs further discussion. The lifetime prevalence of PTSD amongst war
Wednesday, January 1, 2020
Enron Scandal Who Are Responsible for EnronáæS Bankruptcy
Enron was once one of the worlds leading electricity, natural gas, pulp, paper and communications companies. However, in December 2, 2001, Enron suddenly filed for bankruptcy. During the ten years before Enronà ¡Ã ¦s went bankrupt, Enronà ¡Ã ¦s management had started transferring Enronà ¡Ã ¦s funding to personal accounts and made fake balance sheets, which provided investors information about how this company goes. (Gibney, 2005) These illegal actions, performed by certain individuals, finally led Enron to go bankrupt. These peopleà ¡Ã ¦s unethical behaviors such as CEO (Chief Executive Officer) of Enron, auditors and journalists caused Enron to go bankrupt, and therefore are responsible for Enronà ¡Ã ¦s bankruptcy. First of all, the hypocrisy andâ⬠¦show more contentâ⬠¦(Madrick, 2003, p. 5) If Beth McLean published this story before the bankruptcy, investors may have gotten some warming and they would not have bought the stocks. Unfortunately, because of journalists bribes, investors did not realize the actual situation of Enron until Enron went bankrupt. Furthermore, journalists kept reporting some positive news about Enron without checking the dependability. Jeffrey MadrickShow MoreRelatedFailure Of Responsible Management : Enron Corporation1645 Words à |à 7 Pagesexample, which failure of responsible management. The Enron Corporation is an example, because Enron event is the typical case for organization failure of responsible management In the end of 2001, Enron scandal has been disclosure, Enron stock prices slumped, and its financial tricks was exposed. The Securities and Exchange Commission (SEC) began survey of company s records. Enronââ¬â¢s auditor ââ¬ËArthur Andersen ââ¬Ëdestroys relevant documents. (Ailon, G. 2011) Enron was bankruptcy in December 2001, and becameRead MoreEnron Scandal And Its Impact On The Economy Essay1305 Words à |à 6 PagesThe Enron scandal was the largest corporate financial scandal ever when it emerged. It took the economy the better part of a year to recover from the damage the Enron controversy caused to the US as a whole. Enron is not fully responsible, but it was a large contributor to the collapse of the stock market in the early 2000ââ¬â¢s. In the year following the 9/11 hit to our country and economy the DOW lost close to 4500 points; down to 7500 from almost 12000, it did gain some back, but considering the greatRead MoreEnron Scandal Of Enron Corporation Essay114 5 Words à |à 5 PagesIntroduction Enron scandal which aroused in 2001 was one of the most famous events in the area of fraud audit. As the auditor company of Enron, Arthur Andersen failed to prepare true and fair auditing reports. They both suffered lethal loss at that time. The following paragraphs will discuss this fraud event, including the organization history, the organizationââ¬â¢s event, the fraud issue in the event, the consequence of the main stakeholders, auditors in the event and their roles, and the current situationRead MoreEnron And The Enron Scandal1588 Words à |à 7 PagesEnron was a corporation located in Houston, Texas and in just fifteen years the US energy trading and utilities company grew to become one of Americaââ¬â¢s largest and more successful cooperationââ¬â¢s. Enron suffered a major fall. After being one of the most successful corporations Enron became the biggest company to file bankruptcy in history. In this research paper it will discuss about the history of Enron, the fraud c ommitted and who is to blame. The historical development of white collar crime in theRead MoreEnron And The Enron Scandal1387 Words à |à 6 PagesEnron, The Shadiest Guys In the Room When you ask young people about the Enron scandal today, most of them have not even heard of it. The fact of the matter is, it is very relevant to young professionals today. Enron is the most recent story of classic Wall Street greed and fraud. However it is still argued today by different stakeholders who are is responsible. This essay will take the viewpoint from multiple stakeholders to use the Enron Scandal as an example to further explain American corporateRead MoreEnron : Enron And Enron1298 Words à |à 6 PagesIntroduction Enron lead the American energy, commodities, Enron Services was based in Houston, TX. During the turn of the 21st century Enron had an employee base of 20,000 people on payroll. Enron made profits by selling electricity, natural gas, communications, and pulp and paper. Enronââ¬â¢s revenues totaled over $101 billion in 2000. Due to Enronââ¬â¢s earning Fortune named Enron as the America Most Innovative Company. Enron was one of the biggest publicly traded companies and highly trustedRead MoreEnron : Enron And Enron1298 Words à |à 6 PagesIntroduction Enron lead the American energy, commodities, Enron Services was based in Houston, TX. During the turn of the 21st century Enron had an employee base of 20,000 people on payroll. Enron made profits by selling electricity, natural gas, communications, and pulp and paper. Enronââ¬â¢s revenues totaled over $101 billion in 2000. Due to Enronââ¬â¢s earning Fortune named Enron as the America Most Innovative Company. Enron was one of the biggest publicly traded companies and highly trustedRead MoreEnron s Of Houston Natural Gas And Omaha Based Inter North1347 Words à |à 6 PagesEnron s origins date back to 1985 when it began life as an interstate pipeline company through the merger of Houston Natural Gas and Omaha-based Inter North. Kenneth Lay, the former chief executive officer of Houston Natural Gas, became CEO, and the next year won the post of chairman. From the pipeline sector, Enron began moving into new fields. In 1999, the company launched its broadband services unit and Enron Online, the company s website for trading commodities, which soon became the largestRead MoreEnron Corporation : The Largest Energy Trading Essay1131 Words à |à 5 PagesEnron Corporation is the largest energy-trading located in Houston, Texas. It was founded by Kenneth L. Lay in 1985. Enron has been form through the merger between Houston Natural Gas and InterNorth Incorporation and initially named it as HNG/Inter-North Incorporation, before renames it as Enteron. In 1986, the company name has been shortened to Enron Corporation. At the beginning of the operation, Enron only involved in the transmission and distribution of electricity and gas throughout the UnitedRead MoreCorporate Scandals And The Implact Of The Sarbanes Oxley Act1472 Words à |à 6 PagesA LOOK AT CORPORATE SCANDALS AND THE IMPLACT OF THE SARBANES-OXLEY ACT OF 2002 I. INTRODUCTION An economic boom filled with fraud, collapsed in the early 2000s with the unravelling of Enron in October 2001 followed by the implosion of WorldCom and many others big corporations. The downfall of these major companies led to a wide spread crisis of confidence in the financial markets. A crisis caused by executive greed was able to be magnified when the gatekeepers, the auditors, lawyers and analysts